Client:
Campanario Renovables Node
- Type of project : Grid connection infrastructure for renewables
- Substation : 132/400 kV
- Transmission line : 0,5 KM 400 KV
780 MVA
Albacete
, Spain
Capital Energy, Cobra, Elawan, Grupo Zaragozá, Rotonda
Project’s scope:
Permitting Project and Owner's Engineering Substation and Line.
Description:
- Grid Connection Project (+750 MW Wind & PV)
- Executive Technical Project for Permitting.
- Technical support for transformer procurement (780 MVA).
- EPC contract management.
- Substation and line Detailed Engineering review.
- FAT tests Supervision.
- Quality, planning and certifications control.
- Project management.