{"id":8423,"date":"2024-07-05T13:09:44","date_gmt":"2024-07-05T11:09:44","guid":{"rendered":"https:\/\/solida.com.es\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/"},"modified":"2024-07-05T13:09:44","modified_gmt":"2024-07-05T11:09:44","slug":"solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park","status":"publish","type":"post","link":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/","title":{"rendered":"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8389 size-large\" src=\"https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4176-1024x768.webp?resize=1024%2C362&#038;ssl=1\" alt=\"\" width=\"1024\" height=\"362\"><\/p>\n<p>Last Thursday, 27 June, S\u00d3LIDA had the honour of participating in the groundbreaking ceremony of the Valdezorita Photovoltaic Solar Park, organised by Abo Energy Spain. This milestone represents a crucial moment both for Abo Energy, as it is their first turnkey project in Spain, and for S\u00d3LIDA, who has worked hand in hand with the company throughout the development process since its inception in 2019.<\/p>\n<p>The Valdezorita project, located in the municipalities of Yebra, Zorita de los Canes, and Almonacid de Zorita (Guadalajara), is a clear example of energy transition in action. This solar park will replace part of the energy that was produced by the Jos\u00e9 Cabrera nuclear power plant after its decommissioning, providing electricity to 11,500 homes and contributing to the reduction of 53,000 tonnes of CO2 per year. This will be achieved thanks to its 86,562 photovoltaic modules equipped with innovative solar tracking technology adaptable to the terrain, giving it a peak capacity of 49.99 MW and producing more than 100 GWh per year.<\/p>\n<p>Since 2019, S\u00d3LIDA has worked intensively as the <strong>engineering firm responsible for the project<\/strong>, from the application for grid access and connection to obtaining all the documentation for the construction permit. However, their involvement has not been limited to the Valdezorita photovoltaic project; it also extends to the evacuation infrastructure that Abo Energy shares with other developers in a joint effort to minimise the ecological impact of the projects, as highlighted by Patricia Comes, Managing Director of Abo Energy Spain, during the presentation. S\u00d3LIDA has carried out all the engineering and associated studies in the development and tender phases of both the Yebra substation and the evacuation lines and the position at the Jos\u00e9 Cabrera collector substation, with special relevance to the bathymetry for the directional drilling under the Tajo River, or the support for the purchase of the transformer or the EPC tender. Currently, in the construction phase, S\u00d3LIDA serves as the <strong>Project Management <\/strong> and <strong>Owner\u2019s Engineering<\/strong>.<\/p>\n<p>&#8220;It is a pride to participate in this type of project that demonstrates the power of joint work (developers, engineering, contractors, Public Administration, landowners, among others involved), whose effort has contributed to overcoming various challenges and achieving a transition towards cleaner and more sustainable energies from which the entire region will benefit,&#8221; highlighted Andr\u00e9s Medina, Business Development Director of S\u00d3LIDA..<\/p>\n<p>An example of this collaboration was the representation at the event, which was attended by the Abo Energy team, led by their Managing Director Patricia Comes, along with all the suppliers involved in the project, as well as authorities such as Mr. Alipio Garc\u00eda, Director General of Energy Transition of Castilla-La Mancha; Mr. Jos\u00e9 Luis Escudero, Provincial Delegate of the Junta de Comunidades de Castilla-La Mancha in Guadalajara; Mr. Rub\u00e9n Garc\u00eda, Provincial Delegate for Sustainable Development in Guadalajara, as well as mayors from the area..<\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8414 size-medium\" src=\"https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2024\/07\/Foto-1-300x225.webp?resize=300%2C225&#038;ssl=1\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2024\/07\/Foto-1-scaled.webp?resize=300%2C225&amp;ssl=1 300w, https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2024\/07\/Foto-1-scaled.webp?resize=1024%2C768&amp;ssl=1 1024w, https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2024\/07\/Foto-1-scaled.webp?resize=533%2C400&amp;ssl=1 533w, https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2024\/07\/Foto-1-scaled.webp?w=2280&amp;ssl=1 2280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>  <img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-8393 size-medium\" src=\"https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4191-300x225.webp?resize=300%2C225&#038;ssl=1\" alt=\"\" width=\"300\" height=\"225\" data-wp-editing=\"1\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Last Thursday, 27 June, S\u00d3LIDA had the honour of participating in the groundbreaking ceremony of the Valdezorita Photovoltaic Solar Park, organised by Abo Energy Spain.<\/p>\n","protected":false},"author":3,"featured_media":8386,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[114],"tags":[],"class_list":["post-8423","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park - S\u00f3lida<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park - S\u00f3lida\" \/>\n<meta property=\"og:description\" content=\"Last Thursday, 27 June, S\u00d3LIDA had the honour of participating in the groundbreaking ceremony of the Valdezorita Photovoltaic Solar Park, organised by Abo Energy Spain.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/\" \/>\n<meta property=\"og:site_name\" content=\"S\u00f3lida\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-05T11:09:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4156-scaled.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Solida Administrador\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Solida Administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/\"},\"author\":{\"name\":\"Solida Administrador\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#\\\/schema\\\/person\\\/6d5bb661215a6aed0ad7743800fe774f\"},\"headline\":\"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park\",\"datePublished\":\"2024-07-05T11:09:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/\"},\"wordCount\":485,\"image\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/IMG_4156-scaled.webp\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/\",\"url\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/\",\"name\":\"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park - S\u00f3lida\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/IMG_4156-scaled.webp\",\"datePublished\":\"2024-07-05T11:09:44+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#\\\/schema\\\/person\\\/6d5bb661215a6aed0ad7743800fe774f\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/#primaryimage\",\"url\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/IMG_4156-scaled.webp\",\"contentUrl\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/IMG_4156-scaled.webp\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/solida.com.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/solida.com.es\\\/en\\\/\",\"name\":\"S\u00f3lida\",\"description\":\"Ingeniera especializada en renovables\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/solida.com.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#\\\/schema\\\/person\\\/6d5bb661215a6aed0ad7743800fe774f\",\"name\":\"Solida Administrador\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g\",\"caption\":\"Solida Administrador\"},\"url\":\"https:\\\/\\\/solida.com.es\\\/en\\\/author\\\/solida-administrador\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park - S\u00f3lida","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/","og_locale":"en_US","og_type":"article","og_title":"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park - S\u00f3lida","og_description":"Last Thursday, 27 June, S\u00d3LIDA had the honour of participating in the groundbreaking ceremony of the Valdezorita Photovoltaic Solar Park, organised by Abo Energy Spain.","og_url":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/","og_site_name":"S\u00f3lida","article_published_time":"2024-07-05T11:09:44+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4156-scaled.webp","type":"image\/jpeg"}],"author":"Solida Administrador","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Solida Administrador","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/#article","isPartOf":{"@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/"},"author":{"name":"Solida Administrador","@id":"https:\/\/solida.com.es\/en\/#\/schema\/person\/6d5bb661215a6aed0ad7743800fe774f"},"headline":"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park","datePublished":"2024-07-05T11:09:44+00:00","mainEntityOfPage":{"@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/"},"wordCount":485,"image":{"@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/#primaryimage"},"thumbnailUrl":"https:\/\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4156-scaled.webp","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/","url":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/","name":"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park - S\u00f3lida","isPartOf":{"@id":"https:\/\/solida.com.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/#primaryimage"},"image":{"@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/#primaryimage"},"thumbnailUrl":"https:\/\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4156-scaled.webp","datePublished":"2024-07-05T11:09:44+00:00","author":{"@id":"https:\/\/solida.com.es\/en\/#\/schema\/person\/6d5bb661215a6aed0ad7743800fe774f"},"breadcrumb":{"@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/#primaryimage","url":"https:\/\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4156-scaled.webp","contentUrl":"https:\/\/solida.com.es\/wp-content\/uploads\/2024\/07\/IMG_4156-scaled.webp","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/solida.com.es\/en\/solida-participates-in-the-groundbreaking-ceremony-of-the-valdezorita-solar-park\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/solida.com.es\/en\/"},{"@type":"ListItem","position":2,"name":"S\u00d3LIDA Participates in the Groundbreaking Ceremony of the Valdezorita Solar Park"}]},{"@type":"WebSite","@id":"https:\/\/solida.com.es\/en\/#website","url":"https:\/\/solida.com.es\/en\/","name":"S\u00f3lida","description":"Ingeniera especializada en renovables","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/solida.com.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/solida.com.es\/en\/#\/schema\/person\/6d5bb661215a6aed0ad7743800fe774f","name":"Solida Administrador","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g","caption":"Solida Administrador"},"url":"https:\/\/solida.com.es\/en\/author\/solida-administrador\/"}]}},"_links":{"self":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/posts\/8423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/comments?post=8423"}],"version-history":[{"count":0,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/posts\/8423\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/media\/8386"}],"wp:attachment":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/media?parent=8423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/categories?post=8423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/tags?post=8423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}