{"id":5272,"date":"2021-03-15T09:39:36","date_gmt":"2021-03-15T08:39:36","guid":{"rendered":"https:\/\/solida.com.es\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/"},"modified":"2022-08-31T13:58:17","modified_gmt":"2022-08-31T11:58:17","slug":"solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain","status":"publish","type":"post","link":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/","title":{"rendered":"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain"},"content":{"rendered":"<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-3522 size-large\" src=\"https:\/\/i0.wp.com\/solida.com.es\/wp-content\/uploads\/2021\/03\/Campanario-III.jpg?resize=1024%2C768&#038;ssl=1\" alt=\"Trabajadores de S\u00f3lida en subestaci\u00f3n el\u00e9ctrica\" width=\"1024\" height=\"768\" \/><\/p>\n<p>When the <strong>new Royal Decree-Law on renewables<\/strong> was published on June 24, 2020, the alarms went off in many offices and time began to run against many developers.<\/p>\n<p><strong>A maximum period of 6 months<\/strong> was established for the application and admission to process of the <strong>Prior Administrative Authorization (AAP).<\/strong><\/p>\n<p>On the other hand, a maximum distance limit of 10 km was defined with respect to what was requested at the connection point, something difficult to solve in such a short time for those who did not have the land closed or had not taken this condition into account.<\/p>\n<p>&#8220;From the beginning we were clear that the final stretch of the year was going to be frenetic and we could not let our clients down,&#8221; says Andr\u00e9s Medina, director of Business Development at S\u00d3LIDA Energ\u00edas Renovables, the engineering company that has presented the most administrative projects in Spain in the last years.<\/p>\n<p>\u201cIn less than 6 months we have carried out more than 150 photovoltaic and wind projects, including substations, and more than <strong>550 km<\/strong> of evacuation lines\u201d, confirms Andr\u00e9s Medina.<\/p>\n<p>The effort has been worth it, since <strong>100% of its projects, totaling 6,286 MW,<\/strong> have achieved the milestone of admission for processing in practically the entire national territory: Andalusia, Extremadura, Castilla-La Mancha, Murcia, Valencian Community, Castilla y Le\u00f3n, Madrid, Galicia, Navarra, Arag\u00f3n, Catalonia, the Balearic Islands and the Canary Islands.<\/p>\n<p>\u201cThe pressure has been very high, but we have shown why S\u00d3LIDA is today the leading engineering company in the sector\u201d, concludes Andr\u00e9s Medina.<\/p>\n<p>Source:<\/p>\n<p><a href=\"https:\/\/elperiodicodelaenergia.com\/solida-energias-renovables-consigue-la-admision-a-tramite-de-6-286-mw-fotovoltaicos-y-eolicos-en-espana\/\" target=\"_blank\" rel=\"noopener\">El peri\u00f3dico de la energ\u00eda<\/a><\/p>\n<p><a href=\"https:\/\/www.energetica21.com\/noticia\/solida-energias-renovables-consigue-la-admision-a-tramite-de-6286-mw-fotovoltaicos-y-eolicos-en-espana\" target=\"_blank\" rel=\"noopener\">Energ\u00e9tica 21<\/a><\/p>\n<p><a href=\"https:\/\/www.evwind.com\/2021\/03\/15\/solida-energias-renovables-consigue-la-admision-a-tramite-de-6-286-mw-de-fotovoltaica-y-eolica-en-espana\/\" target=\"_blank\" rel=\"noopener\">Ev Wind<\/a><\/p>\n<p><a href=\"https:\/\/www.pv-magazine.es\/2021\/03\/15\/solida-energias-renovables-consigue-la-admision-a-tramite-de-mas-de-6-gw-renovables-para-terceros-en-espana\/\" target=\"_blank\" rel=\"noopener\">PV Magazine<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>More than 200 projects reach the milestone established last year by Royal Decree-Law 23\/2020.<\/p>\n","protected":false},"author":3,"featured_media":3523,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"image","meta":{"footnotes":""},"categories":[114],"tags":[],"class_list":["post-5272","post","type-post","status-publish","format-image","has-post-thumbnail","hentry","category-uncategorized","post_format-post-format-image"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain - S\u00f3lida<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain - S\u00f3lida\" \/>\n<meta property=\"og:description\" content=\"More than 200 projects reach the milestone established last year by Royal Decree-Law 23\/2020.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/\" \/>\n<meta property=\"og:site_name\" content=\"S\u00f3lida\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-15T08:39:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-31T11:58:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/solida.com.es\/wp-content\/uploads\/2021\/03\/Campanario-III-cuadrado.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"954\" \/>\n\t<meta property=\"og:image:height\" content=\"954\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Solida Administrador\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Solida Administrador\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/\"},\"author\":{\"name\":\"Solida Administrador\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#\\\/schema\\\/person\\\/6d5bb661215a6aed0ad7743800fe774f\"},\"headline\":\"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain\",\"datePublished\":\"2021-03-15T08:39:36+00:00\",\"dateModified\":\"2022-08-31T11:58:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/\"},\"wordCount\":281,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/Campanario-III-cuadrado.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/\",\"url\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/\",\"name\":\"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain - S\u00f3lida\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/Campanario-III-cuadrado.jpg\",\"datePublished\":\"2021-03-15T08:39:36+00:00\",\"dateModified\":\"2022-08-31T11:58:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#\\\/schema\\\/person\\\/6d5bb661215a6aed0ad7743800fe774f\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#primaryimage\",\"url\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/Campanario-III-cuadrado.jpg\",\"contentUrl\":\"https:\\\/\\\/solida.com.es\\\/wp-content\\\/uploads\\\/2021\\\/03\\\/Campanario-III-cuadrado.jpg\",\"width\":954,\"height\":954},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/solida.com.es\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/solida.com.es\\\/en\\\/\",\"name\":\"S\u00f3lida\",\"description\":\"Ingeniera especializada en renovables\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/solida.com.es\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/solida.com.es\\\/en\\\/#\\\/schema\\\/person\\\/6d5bb661215a6aed0ad7743800fe774f\",\"name\":\"Solida Administrador\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g\",\"caption\":\"Solida Administrador\"},\"url\":\"https:\\\/\\\/solida.com.es\\\/en\\\/author\\\/solida-administrador\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain - S\u00f3lida","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/","og_locale":"en_US","og_type":"article","og_title":"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain - S\u00f3lida","og_description":"More than 200 projects reach the milestone established last year by Royal Decree-Law 23\/2020.","og_url":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/","og_site_name":"S\u00f3lida","article_published_time":"2021-03-15T08:39:36+00:00","article_modified_time":"2022-08-31T11:58:17+00:00","og_image":[{"width":954,"height":954,"url":"https:\/\/solida.com.es\/wp-content\/uploads\/2021\/03\/Campanario-III-cuadrado.jpg","type":"image\/jpeg"}],"author":"Solida Administrador","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Solida Administrador","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#article","isPartOf":{"@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/"},"author":{"name":"Solida Administrador","@id":"https:\/\/solida.com.es\/en\/#\/schema\/person\/6d5bb661215a6aed0ad7743800fe774f"},"headline":"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain","datePublished":"2021-03-15T08:39:36+00:00","dateModified":"2022-08-31T11:58:17+00:00","mainEntityOfPage":{"@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/"},"wordCount":281,"commentCount":0,"image":{"@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/solida.com.es\/wp-content\/uploads\/2021\/03\/Campanario-III-cuadrado.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/","url":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/","name":"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain - S\u00f3lida","isPartOf":{"@id":"https:\/\/solida.com.es\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#primaryimage"},"image":{"@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/solida.com.es\/wp-content\/uploads\/2021\/03\/Campanario-III-cuadrado.jpg","datePublished":"2021-03-15T08:39:36+00:00","dateModified":"2022-08-31T11:58:17+00:00","author":{"@id":"https:\/\/solida.com.es\/en\/#\/schema\/person\/6d5bb661215a6aed0ad7743800fe774f"},"breadcrumb":{"@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#primaryimage","url":"https:\/\/solida.com.es\/wp-content\/uploads\/2021\/03\/Campanario-III-cuadrado.jpg","contentUrl":"https:\/\/solida.com.es\/wp-content\/uploads\/2021\/03\/Campanario-III-cuadrado.jpg","width":954,"height":954},{"@type":"BreadcrumbList","@id":"https:\/\/solida.com.es\/en\/solida-achieves-the-admission-for-processing-of-6286-photovoltaic-and-wind-mw-in-spain\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/solida.com.es\/en\/"},{"@type":"ListItem","position":2,"name":"S\u00d3LIDA achieves the admission for processing of 6,286 photovoltaic and wind MW in Spain"}]},{"@type":"WebSite","@id":"https:\/\/solida.com.es\/en\/#website","url":"https:\/\/solida.com.es\/en\/","name":"S\u00f3lida","description":"Ingeniera especializada en renovables","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/solida.com.es\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/solida.com.es\/en\/#\/schema\/person\/6d5bb661215a6aed0ad7743800fe774f","name":"Solida Administrador","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/fb786a37b6aa4e6c8fcb84c41d1c12ab0de39c097abe6ba793fedc2e0041d95f?s=96&d=mm&r=g","caption":"Solida Administrador"},"url":"https:\/\/solida.com.es\/en\/author\/solida-administrador\/"}]}},"_links":{"self":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/posts\/5272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/comments?post=5272"}],"version-history":[{"count":0,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/posts\/5272\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/media\/3523"}],"wp:attachment":[{"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/media?parent=5272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/categories?post=5272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/solida.com.es\/en\/wp-json\/wp\/v2\/tags?post=5272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}